*Unless of course you're building a rainwater collection system and have the roof hooked up to the cisterns. Then we'll want lots of rain to get the cisterns full for the winter ;-)
The picture to the left shows the lower level with the filled-in sand. The two lonely walls in the center are the support for the poured concrete ceiling (the cDeck) to leave an opening for the stairs. The concrete slab to the right is the support for the masonry stove. Left of the support walls you can see a shallow trench which is for the drain of the kitchen sink and dishwasher.
So the rain will do a good job of packing the fill-sand down for the pour of the concrete slab next week.